by Christian Poirier | May 25, 2015 | Commercial
The Gourmet Complex is a unique and refined building that is ambitious and creative in its architectural intentions, thus contributing to the architectural and cultural spirit of the Molewa project. It responds admirably to the main design challenges raised by a...
by Christian Poirier | Mar 28, 2015 | Institutional, Institutional, Project
The new 2 075 m² single storey building houses kitchen and dining facilities for the National Defence at the Farnham Garrison, Quebec. The dining hall is designed to accommodate 300 seats, and the kitchen has a capacity of 600 meals [two services] per hour. To...
by Christian Poirier | Mar 28, 2015 | Institutional, Institutional, Project, Project
Renovation and extension of a training centre at the Farnham Garrison. This project, designed to LEED Silver standards, comprises a 1 550m² addition to an existing 1 875 m² building. The building includes offices, locker rooms, storage facilities, an assembly area...
by Christian Poirier | Mar 25, 2015 | Industrial, Industrial, Project, Project
Design and construction of a new 32,000 square foot industrial building to house a factory and offices.The building has great visibility from the highway and it was important to the client that the architectural aesthetic project an image of quality. The overall...
by Christian Poirier | Mar 25, 2015 | Commercial
The project involves the realization of a theatre located in the historic center of the city of Hudson. The latter appealed to the creativity of our firm to design an extension to the current theater to revitalize the place and make it a true cultural centre. The aim...