The project includes work to redevelop the sports sector of the main building (commonly called “the Méga”) at the St‐Jean garrison, the demolition of an existing building as well as the construction of a new indoor stadium adjacent to the Méga , with a three-story link between the stadium and the existing building. The complete project (renovation + new construction) covers an area of approximately 18,000m². The project, which aims for LEED Canada NC 2009 certification, Silver level, was carried out in consortium with the firm ZAS.
Curtiss Dining Hall, Borden
This new one and half storey building, totalling 5 483 m², houses a kitchen and a dining room for the National Defense at the Canadian Forces Base Borden in Ontario. Designed for 750 people, the kitchen serves 1500 meals (2 services) an hour. The building provides...